If I have a design and I need to measure the effect of transmitted power on BER,How I can run Optisystem to Change Transmitted power and run the design then record the results automatically for different values of transmitted power without my intervention.

Responses (4):

    • #16906
      Profile Photo
      Abdallah Ismail
      Participant

      If I have a design and I need to measure the effect of transmitted power on BER,How I can run Optisystem to Change Transmitted power and run the design then record the results automatically for different values of transmitted power without my intervention.

    • #16974
      Profile Photo
      Damian Marek
      Participant

      This is possible in using the Sweep mode. By changing the power parameter for the transmitter it is possible to run the simulation multiple times and record the results.

      Here is a tutorial on this subject:

      Lesson 4: Parameter Sweeps — BER x Input Power

      Regards

      +1
    • #17104
      Profile Photo
      Heitor Galvao
      Participant

      Manually takes too much power and BER value recording, the beManually takes too much power and BER value recording, the best way to do is sweep parameters in case power vs BER.st way to do is sweep parameters in case BER vs power.

    • #18563
      Profile Photo
      Abdallah Ismail
      Participant

      The results appear as small point that may be unreadable,How can make it large marks like matlab.

      • #18572
        Profile Photo
        Damian Marek
        Participant

        You can change the chart properties by left clicking the small blue icon at the top left of the chart and heading to the Properties tab.