Home Forums GENERAL Risee time Budgeet

Viewing 0 reply threads
  • Author
    Posts
    • #79894

      I have a problem when I want to find the rise time budget, the formula used to find the rise time budget is tsis= (Ttx + Tmod + Tgvd + Trx). The Ttx value is the value that comes from the system that we make how can I find out the Ttx value from the simulation results that I did this? please help

Viewing 0 reply threads
  • You must be logged in to reply to this topic.