Home › Forums › SYSTEM › Schedule running › Reply To: Schedule running
January 7, 2015 at 11:43 am
#17104
Manually takes too much power and BER value recording, the beManually takes too much power and BER value recording, the best way to do is sweep parameters in case power vs BER.st way to do is sweep parameters in case BER vs power.
Categories
- All
-
Knowledge
Contains a detailed Q&A knowledge base. -
General
All non-technical questions. -
System
Optical system design and analysis. -
Instrument
Communicate and control different kinds of instruments. -
SPICE
Opto-electronic circuit design. -
FDTD
Finite-Difference Time-Domain simulation. -
BPM
Beam Propagation Method analysis and design. -
Grating
Fiber optic grating simulation. -
Fiber
Optical fiber design and characterization. -
Exchange
Users can exchange design files.
(Matlab, C++, etc.)