Home › Forums › SYSTEM › Schedule running › Reply To: Schedule running
January 2, 2015 at 9:20 am
#16974
This is possible in using the Sweep mode. By changing the power parameter for the transmitter it is possible to run the simulation multiple times and record the results.
Here is a tutorial on this subject:
Regards
Categories
- All
-
Knowledge
Contains a detailed Q&A knowledge base. -
General
All non-technical questions. -
System
Optical system design and analysis. -
Instrument
Communicate and control different kinds of instruments. -
SPICE
Opto-electronic circuit design. -
FDTD
Finite-Difference Time-Domain simulation. -
BPM
Beam Propagation Method analysis and design. -
Grating
Fiber optic grating simulation. -
Fiber
Optical fiber design and characterization. -
Exchange
Users can exchange design files.
(Matlab, C++, etc.)