Home › Forums › SYSTEM › validation › Reply To: validation
January 15, 2020 at 6:52 am
#63638
Dear Asha,
The validation of OptiSystem is done through comparing the results of the models with already published experimental papers and with results provided by partners in the industry and academia.
What models that you’d like to get validation on?
Regards,
Ahmad
Categories
- All
-
Knowledge
Contains a detailed Q&A knowledge base. -
General
All non-technical questions. -
System
Optical system design and analysis. -
Instrument
Communicate and control different kinds of instruments. -
SPICE
Opto-electronic circuit design. -
FDTD
Finite-Difference Time-Domain simulation. -
BPM
Beam Propagation Method analysis and design. -
Grating
Fiber optic grating simulation. -
Fiber
Optical fiber design and characterization. -
Exchange
Users can exchange design files.
(Matlab, C++, etc.)