Home Forums GENERAL HOW TO CALCULATE "RISE TIME BUDGET" USING OPTI SYSTEM

Viewing 1 reply thread
  • Author
    Posts
    • #43385
      nugraha septiana
      Participant

      Hello.

      I am a new user opti system
      I want to try counting “RISE TIME BUDGET”
      Can you give me an example link opti system to calculate “rise time budget” and how to read the simulation result?
      Your help in this case will help me a lot.

      thank you

    • #43648
      Marc Verreault
      Participant

      Good day,

      To calculate the rise budget you will need to estimate the rise time performance of various components such as the transmitter and receiver. This can be measured using the optical and electric time domain viewers (you can use the marker feature to find the 80-20 or 90-10 rise points).

      I recommend checking out the following link on the parameters associated with rise time budget calculation (many of these parameters can be set in OptiSystem): https://bohr.wlu.ca/hshodiev/PC481/download/PC481_7%20Part%20II.pdf

      Cheers.

Viewing 1 reply thread
  • You must be logged in to reply to this topic.