Home Forums SYSTEM Link Budget Reply To: Link Budget

#31526
Profile Photo
alistu
Participant

Hi Ranjeet,

Link budget and power budget are the same. It involves calculating all the losses and gains in the transmission line to see how much power should be sent for the received signal power to have at least a certain power. In can be calculated this way:

Received Power (dBm) = Transmitted Power (dBm) + Gains (dB) − Losses (dB)

Regards

Categories